{"id":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","naam":"test","status":"ACTIEF","projectType":"DAKKAPEL","adres":"statenlaan 77","woningtype":null,"bouwjaar":null,"gewensteStart":"2026-07-14T00:00:00.000Z","budgetMinCents":null,"budgetMaxCents":null,"zelfwerkzaamheid":"DEELS_ZELF","templateVersionId":"26db38cb-83f8-431b-980f-7a19b9a2486c","ownerId":"140287ce-5672-4db0-bf62-212010dee8bb","paspoort":{"opties":{"vloerverwarming":false}},"createdAt":"2026-07-12T22:11:02.714Z","updatedAt":"2026-07-12T22:11:02.731Z","scopeItems":[{"id":"361279ad-fd04-4086-abb0-d4c446d6451b","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","naam":"Prefab dakkapel (levering en plaatsing)","omschrijving":null,"status":"IN_SCOPE","templateNodeId":"scope.dakkapel","templateVersion":2,"ruleId":"gen.scope.dakkapel","createdAt":"2026-07-12T22:11:02.749Z"},{"id":"d2dd2d28-2fcf-4247-ba92-d81f4155f76b","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","naam":"Binnenafwerking en elektra","omschrijving":null,"status":"IN_SCOPE","templateNodeId":"scope.binnen","templateVersion":2,"ruleId":"gen.scope.binnen","createdAt":"2026-07-12T22:11:02.751Z"}],"workPackages":[{"id":"fb40b405-183f-4ade-8369-7f5754136c50","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","naam":"Vergunning & besluit","omschrijving":"Vergunningcheck, constructeur, offertes — hier zit de meeste doorlooptijd.","vakgebied":"algemeen","volgorde":80,"templateNodeId":"wp.papierwerk","templateVersion":2,"ruleId":"gen.wp.papierwerk","createdAt":"2026-07-12T22:11:02.737Z"},{"id":"1e6acee9-ff47-4c43-8a45-cb61c4896a22","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","naam":"Productie & voorbereiding","omschrijving":"Prefab-productie (6–10 weken) en alles regelen voor de plaatsingsdag.","vakgebied":"algemeen","volgorde":95,"templateNodeId":"wp.bestellen","templateVersion":2,"ruleId":"gen.wp.bestellen","createdAt":"2026-07-12T22:11:02.740Z"},{"id":"ed973ad2-3a1e-4627-8141-34ee78dfcced","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","naam":"Plaatsingsdag","omschrijving":"Dak open, kraan, dakkapel erin en waterdicht — in één dag.","vakgebied":"bouw","volgorde":200,"templateNodeId":"wp.plaatsing","templateVersion":2,"ruleId":"gen.wp.plaatsing","createdAt":"2026-07-12T22:11:02.741Z"},{"id":"1ad91ea0-7050-4df5-83d5-f7898cc6c54b","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","naam":"Binnenafwerking","omschrijving":"Isolatie afwerken, wanden, elektra, vensterbank en schilderwerk.","vakgebied":"afbouw","volgorde":300,"templateNodeId":"wp.afwerking","templateVersion":2,"ruleId":"gen.wp.afwerking","createdAt":"2026-07-12T22:11:02.743Z"},{"id":"f97b5e58-57c3-4c80-bb70-bc10df5086be","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","naam":"Oplevering & nazorg","omschrijving":"Opleveren, documentatie en controle na de eerste regenbui.","vakgebied":"algemeen","volgorde":440,"templateNodeId":"wp.nazorg","templateVersion":2,"ruleId":"gen.wp.nazorg","createdAt":"2026-07-12T22:11:02.745Z"}],"tasks":[{"id":"74758fa9-a031-4045-afb5-d349bfc10cca","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"fb40b405-183f-4ade-8369-7f5754136c50","naam":"Constructieberekening laten maken","omschrijving":null,"vakgebied":"constructie","duurWerkdagen":5,"status":"GEPLAND","classificatie":"VERPLICHT_GEKWALIFICEERD","uitvoerder":"ONBESLIST","volgorde":82,"geplandeStart":"2026-07-14T00:00:00.000Z","geplandeEind":"2026-07-20T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":60000,"afwijkingBevestigd":false,"templateNodeId":"task.constructeur","templateVersion":2,"ruleId":"gen.task.constructeur","createdAt":"2026-07-12T22:11:02.766Z","updatedAt":"2026-07-12T22:11:02.972Z"},{"id":"3ac420ba-0954-4758-9a31-1968eda1c36c","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"fb40b405-183f-4ade-8369-7f5754136c50","naam":"Vergunningcheck en zo nodig omgevingsvergunning aanvragen","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":40,"status":"GEPLAND","classificatie":"CONTROLE_AANBEVOLEN","uitvoerder":"ONBESLIST","volgorde":81,"geplandeStart":"2026-07-21T00:00:00.000Z","geplandeEind":"2026-09-14T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":25000,"afwijkingBevestigd":false,"templateNodeId":"task.vergunning","templateVersion":2,"ruleId":"gen.task.vergunning","createdAt":"2026-07-12T22:11:02.761Z","updatedAt":"2026-07-12T22:11:02.975Z"},{"id":"d82bcf61-05ce-42b1-9ed9-6b4ddd9c3a8d","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"fb40b405-183f-4ade-8369-7f5754136c50","naam":"VvE- of verhuurderstoestemming regelen","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":83,"geplandeStart":"2026-07-14T00:00:00.000Z","geplandeEind":"2026-07-14T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.vve","templateVersion":2,"ruleId":"gen.task.vve","createdAt":"2026-07-12T22:11:02.769Z","updatedAt":"2026-07-12T22:11:02.977Z"},{"id":"358f8982-4841-4afc-acea-8ad821418145","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"fb40b405-183f-4ade-8369-7f5754136c50","naam":"Check op vleermuizen en nestelende vogels in het dak","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"CONTROLE_AANBEVOLEN","uitvoerder":"ONBESLIST","volgorde":84,"geplandeStart":"2026-07-14T00:00:00.000Z","geplandeEind":"2026-07-14T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.ecologie","templateVersion":2,"ruleId":"gen.task.ecologie","createdAt":"2026-07-12T22:11:02.771Z","updatedAt":"2026-07-12T22:11:02.979Z"},{"id":"69b7aae3-5fab-410e-b8ff-be21093d7998","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"fb40b405-183f-4ade-8369-7f5754136c50","naam":"Offertes vergelijken en opdracht geven","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":10,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":86,"geplandeStart":"2026-07-14T00:00:00.000Z","geplandeEind":"2026-07-27T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.offertes","templateVersion":2,"ruleId":"gen.task.offertes","createdAt":"2026-07-12T22:11:02.773Z","updatedAt":"2026-07-12T22:11:02.981Z"},{"id":"02345fe7-4330-4f2a-92e9-eeeeef529456","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"fb40b405-183f-4ade-8369-7f5754136c50","naam":"Verbouwing melden bij opstalverzekering","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":87,"geplandeStart":"2026-07-14T00:00:00.000Z","geplandeEind":"2026-07-14T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.verzekering","templateVersion":2,"ruleId":"gen.task.verzekering","createdAt":"2026-07-12T22:11:02.776Z","updatedAt":"2026-07-12T22:11:02.983Z"},{"id":"9fe22c69-3d62-43bb-9e7d-ea41c7923364","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"fb40b405-183f-4ade-8369-7f5754136c50","naam":"Projectmap aanmaken en alles vastleggen","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":88,"geplandeStart":"2026-07-14T00:00:00.000Z","geplandeEind":"2026-07-14T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.dossier","templateVersion":2,"ruleId":"gen.task.dossier","createdAt":"2026-07-12T22:11:02.777Z","updatedAt":"2026-07-12T22:11:02.984Z"},{"id":"aa274d27-df1d-4997-9661-f9de34db04fc","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"1e6acee9-ff47-4c43-8a45-cb61c4896a22","naam":"Technisch inmeten door de fabrikant","omschrijving":null,"vakgebied":"bouw","duurWerkdagen":1,"status":"GEPLAND","classificatie":"SPECIALIST","uitvoerder":"ONBESLIST","volgorde":99,"geplandeStart":"2026-09-15T00:00:00.000Z","geplandeEind":"2026-09-15T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.inmeten","templateVersion":2,"ruleId":"gen.task.inmeten","createdAt":"2026-07-12T22:11:02.780Z","updatedAt":"2026-07-12T22:11:02.986Z"},{"id":"d418351d-0b41-4629-a710-b1e0d6aa1156","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"1e6acee9-ff47-4c43-8a45-cb61c4896a22","naam":"Wachten op prefab-productie","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":35,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":100,"geplandeStart":"2026-09-16T00:00:00.000Z","geplandeEind":"2026-11-03T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.productie","templateVersion":2,"ruleId":"gen.task.productie","createdAt":"2026-07-12T22:11:02.784Z","updatedAt":"2026-07-12T22:11:02.988Z"},{"id":"d31c62dc-a9f9-4674-9f5e-9c10cfc202e8","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"1e6acee9-ff47-4c43-8a45-cb61c4896a22","naam":"Kraan, wegafzetting en parkeerontheffing regelen","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":101,"geplandeStart":"2026-07-14T00:00:00.000Z","geplandeEind":"2026-07-14T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":45000,"afwijkingBevestigd":false,"templateNodeId":"task.kraan","templateVersion":2,"ruleId":"gen.task.kraan","createdAt":"2026-07-12T22:11:02.785Z","updatedAt":"2026-07-12T22:11:02.989Z"},{"id":"5ab66dbc-9872-499f-a68e-1c8cd06244ea","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"1e6acee9-ff47-4c43-8a45-cb61c4896a22","naam":"Buren informeren over de plaatsingsdag","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":102,"geplandeStart":"2026-07-14T00:00:00.000Z","geplandeEind":"2026-07-14T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.buren","templateVersion":2,"ruleId":"gen.task.buren","createdAt":"2026-07-12T22:11:02.788Z","updatedAt":"2026-07-12T22:11:02.991Z"},{"id":"e246626e-99f6-4573-a4c6-9c74a794cccf","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"1e6acee9-ff47-4c43-8a45-cb61c4896a22","naam":"Zolder leegruimen en beschermen","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":103,"geplandeStart":"2026-07-14T00:00:00.000Z","geplandeEind":"2026-07-14T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.zolder","templateVersion":2,"ruleId":"gen.task.zolder","createdAt":"2026-07-12T22:11:02.789Z","updatedAt":"2026-07-12T22:11:02.992Z"},{"id":"757975ef-3e6b-4ce1-8952-cf2457803fff","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"ed973ad2-3a1e-4627-8141-34ee78dfcced","naam":"Dak openen en raveelconstructie maken","omschrijving":null,"vakgebied":"bouw","duurWerkdagen":1,"status":"GEPLAND","classificatie":"SPECIALIST","uitvoerder":"ONBESLIST","volgorde":210,"geplandeStart":"2026-11-04T00:00:00.000Z","geplandeEind":"2026-11-04T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":120000,"afwijkingBevestigd":false,"templateNodeId":"task.dakopen","templateVersion":2,"ruleId":"gen.task.dakopen","createdAt":"2026-07-12T22:11:02.791Z","updatedAt":"2026-07-12T22:11:02.994Z"},{"id":"51cc5e03-e283-4bb4-9ce0-10bff67ca886","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"ed973ad2-3a1e-4627-8141-34ee78dfcced","naam":"Dakkapel hijsen, stellen en waterdicht afwerken","omschrijving":null,"vakgebied":"bouw","duurWerkdagen":1,"status":"GEPLAND","classificatie":"SPECIALIST","uitvoerder":"ONBESLIST","volgorde":220,"geplandeStart":"2026-11-05T00:00:00.000Z","geplandeEind":"2026-11-05T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":550000,"afwijkingBevestigd":false,"templateNodeId":"task.plaatsen","templateVersion":2,"ruleId":"gen.task.plaatsen","createdAt":"2026-07-12T22:11:02.793Z","updatedAt":"2026-07-12T22:11:02.995Z"},{"id":"6d11c7f7-564a-4f3c-87c2-7d39a88f896a","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"1ad91ea0-7050-4df5-83d5-f7898cc6c54b","naam":"Elektra: stopcontacten, verlichting en eventueel verwarming","omschrijving":null,"vakgebied":"elektra","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VERPLICHT_GEKWALIFICEERD","uitvoerder":"ONBESLIST","volgorde":310,"geplandeStart":"2026-11-06T00:00:00.000Z","geplandeEind":"2026-11-06T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":60000,"afwijkingBevestigd":false,"templateNodeId":"task.elektra","templateVersion":2,"ruleId":"gen.task.elektra","createdAt":"2026-07-12T22:11:02.798Z","updatedAt":"2026-07-12T22:11:02.996Z"},{"id":"6c65c85c-8756-4014-a51a-b20657d1a01b","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"1ad91ea0-7050-4df5-83d5-f7898cc6c54b","naam":"Aansluitingen isoleren en dampdicht afwerken","omschrijving":null,"vakgebied":"afbouw","duurWerkdagen":1,"status":"GEPLAND","classificatie":"SPECIALIST","uitvoerder":"ONBESLIST","volgorde":320,"geplandeStart":"2026-11-06T00:00:00.000Z","geplandeEind":"2026-11-06T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":40000,"afwijkingBevestigd":false,"templateNodeId":"task.isolatie","templateVersion":2,"ruleId":"gen.task.isolatie","createdAt":"2026-07-12T22:11:02.799Z","updatedAt":"2026-07-12T22:11:02.998Z"},{"id":"5a9da270-e7e6-483f-8324-a843882cfdf7","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"1ad91ea0-7050-4df5-83d5-f7898cc6c54b","naam":"Wanden en plafond afwerken (gips en stucwerk)","omschrijving":null,"vakgebied":"afbouw","duurWerkdagen":3,"status":"GEPLAND","classificatie":"SPECIALIST","uitvoerder":"ONBESLIST","volgorde":330,"geplandeStart":"2026-11-09T00:00:00.000Z","geplandeEind":"2026-11-11T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":90000,"afwijkingBevestigd":false,"templateNodeId":"task.wanden","templateVersion":2,"ruleId":"gen.task.wanden","createdAt":"2026-07-12T22:11:02.800Z","updatedAt":"2026-07-12T22:11:02.999Z"},{"id":"c92a6378-498c-4cb9-9532-fd3b9e80fdf5","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"1ad91ea0-7050-4df5-83d5-f7898cc6c54b","naam":"Vensterbank en aftimmerwerk plaatsen","omschrijving":null,"vakgebied":"afbouw","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":340,"geplandeStart":"2026-11-12T00:00:00.000Z","geplandeEind":"2026-11-12T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":25000,"afwijkingBevestigd":false,"templateNodeId":"task.vensterbank","templateVersion":2,"ruleId":"gen.task.vensterbank","createdAt":"2026-07-12T22:11:02.802Z","updatedAt":"2026-07-12T22:11:03.001Z"},{"id":"76b4a215-e24e-486c-8d88-ebd2f714d3b8","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"1ad91ea0-7050-4df5-83d5-f7898cc6c54b","naam":"Sausen en schilderwerk binnen","omschrijving":null,"vakgebied":"afbouw","duurWerkdagen":2,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":350,"geplandeStart":"2026-11-12T00:00:00.000Z","geplandeEind":"2026-11-13T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":35000,"afwijkingBevestigd":false,"templateNodeId":"task.schilderen","templateVersion":2,"ruleId":"gen.task.schilderen","createdAt":"2026-07-12T22:11:02.805Z","updatedAt":"2026-07-12T22:11:03.002Z"},{"id":"8f7e03b3-602d-44cd-8767-2844f565a4d5","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"1ad91ea0-7050-4df5-83d5-f7898cc6c54b","naam":"Rookmelder plaatsen op de verbouwde verdieping","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":355,"geplandeStart":"2026-11-16T00:00:00.000Z","geplandeEind":"2026-11-16T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":5000,"afwijkingBevestigd":false,"templateNodeId":"task.rookmelder","templateVersion":2,"ruleId":"gen.task.rookmelder","createdAt":"2026-07-12T22:11:02.807Z","updatedAt":"2026-07-12T22:11:03.003Z"},{"id":"d34c8456-f741-4cb8-a9a6-186010771ed0","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"f97b5e58-57c3-4c80-bb70-bc10df5086be","naam":"Oplevering en documentatie opeisen","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":442,"geplandeStart":"2026-11-17T00:00:00.000Z","geplandeEind":"2026-11-17T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.oplevering","templateVersion":2,"ruleId":"gen.task.oplevering","createdAt":"2026-07-12T22:11:02.808Z","updatedAt":"2026-07-12T22:11:03.005Z"},{"id":"ce42dc7b-ecba-4dc7-860e-95310080d613","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"f97b5e58-57c3-4c80-bb70-bc10df5086be","naam":"Controle na de eerste flinke regenbui","omschrijving":null,"vakgebied":"algemeen","duurWerkdagen":1,"status":"GEPLAND","classificatie":"VRIJ","uitvoerder":"ONBESLIST","volgorde":445,"geplandeStart":"2026-11-18T00:00:00.000Z","geplandeEind":"2026-11-18T00:00:00.000Z","ankerStart":null,"geschatteKostenCents":0,"afwijkingBevestigd":false,"templateNodeId":"task.regenbui","templateVersion":2,"ruleId":"gen.task.regenbui","createdAt":"2026-07-12T22:11:02.810Z","updatedAt":"2026-07-12T22:11:03.006Z"}],"dependencies":[{"id":"6a83d56f-412c-40f0-aa93-9b0e7ff46d76","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"5ab66dbc-9872-499f-a68e-1c8cd06244ea","successorId":"757975ef-3e6b-4ce1-8952-cf2457803fff","templateNodeId":"task.buren->task.dakopen","templateVersion":2,"ruleId":"gen.dep.task.buren->task.dakopen","createdAt":"2026-07-12T22:11:02.813Z"},{"id":"ccf2e41f-0e92-4b35-bf92-4870da17f1e9","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"74758fa9-a031-4045-afb5-d349bfc10cca","successorId":"3ac420ba-0954-4758-9a31-1968eda1c36c","templateNodeId":"task.constructeur->task.vergunning","templateVersion":2,"ruleId":"gen.dep.task.constructeur->task.vergunning","createdAt":"2026-07-12T22:11:02.815Z"},{"id":"ee2e582f-c651-45c4-acdc-b187d043e359","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"757975ef-3e6b-4ce1-8952-cf2457803fff","successorId":"51cc5e03-e283-4bb4-9ce0-10bff67ca886","templateNodeId":"task.dakopen->task.plaatsen","templateVersion":2,"ruleId":"gen.dep.task.dakopen->task.plaatsen","createdAt":"2026-07-12T22:11:02.816Z"},{"id":"4eb64086-ceea-4d88-bf35-3c487f6e24b0","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"9fe22c69-3d62-43bb-9e7d-ea41c7923364","successorId":"aa274d27-df1d-4997-9661-f9de34db04fc","templateNodeId":"task.dossier->task.inmeten","templateVersion":2,"ruleId":"gen.dep.task.dossier->task.inmeten","createdAt":"2026-07-12T22:11:02.818Z"},{"id":"28d26aa9-d78f-407e-b90c-50fc427b2a35","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"358f8982-4841-4afc-acea-8ad821418145","successorId":"aa274d27-df1d-4997-9661-f9de34db04fc","templateNodeId":"task.ecologie->task.inmeten","templateVersion":2,"ruleId":"gen.dep.task.ecologie->task.inmeten","createdAt":"2026-07-12T22:11:02.819Z"},{"id":"c62be55b-e97e-4884-9a17-f16d34779b6b","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"6d11c7f7-564a-4f3c-87c2-7d39a88f896a","successorId":"5a9da270-e7e6-483f-8324-a843882cfdf7","templateNodeId":"task.elektra->task.wanden","templateVersion":2,"ruleId":"gen.dep.task.elektra->task.wanden","createdAt":"2026-07-12T22:11:02.820Z"},{"id":"6ec7c953-5134-4db3-8a97-dbad3e55fb72","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"aa274d27-df1d-4997-9661-f9de34db04fc","successorId":"d418351d-0b41-4629-a710-b1e0d6aa1156","templateNodeId":"task.inmeten->task.productie","templateVersion":2,"ruleId":"gen.dep.task.inmeten->task.productie","createdAt":"2026-07-12T22:11:02.822Z"},{"id":"82a0ef3b-7def-42fd-a02f-249fe3f0f2ce","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"6c65c85c-8756-4014-a51a-b20657d1a01b","successorId":"5a9da270-e7e6-483f-8324-a843882cfdf7","templateNodeId":"task.isolatie->task.wanden","templateVersion":2,"ruleId":"gen.dep.task.isolatie->task.wanden","createdAt":"2026-07-12T22:11:02.823Z"},{"id":"a2cffd54-22b8-426f-ab57-c6af8ed6a0f2","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"d31c62dc-a9f9-4674-9f5e-9c10cfc202e8","successorId":"757975ef-3e6b-4ce1-8952-cf2457803fff","templateNodeId":"task.kraan->task.dakopen","templateVersion":2,"ruleId":"gen.dep.task.kraan->task.dakopen","createdAt":"2026-07-12T22:11:02.824Z"},{"id":"208261ec-42b5-48cc-9014-19077269d951","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"69b7aae3-5fab-410e-b8ff-be21093d7998","successorId":"aa274d27-df1d-4997-9661-f9de34db04fc","templateNodeId":"task.offertes->task.inmeten","templateVersion":2,"ruleId":"gen.dep.task.offertes->task.inmeten","createdAt":"2026-07-12T22:11:02.825Z"},{"id":"e844f62f-dab0-4ac8-9287-ce9ea78fd4ca","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"d34c8456-f741-4cb8-a9a6-186010771ed0","successorId":"ce42dc7b-ecba-4dc7-860e-95310080d613","templateNodeId":"task.oplevering->task.regenbui","templateVersion":2,"ruleId":"gen.dep.task.oplevering->task.regenbui","createdAt":"2026-07-12T22:11:02.826Z"},{"id":"6720e26d-ef99-4961-becd-59b54d02989f","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"51cc5e03-e283-4bb4-9ce0-10bff67ca886","successorId":"6d11c7f7-564a-4f3c-87c2-7d39a88f896a","templateNodeId":"task.plaatsen->task.elektra","templateVersion":2,"ruleId":"gen.dep.task.plaatsen->task.elektra","createdAt":"2026-07-12T22:11:02.827Z"},{"id":"1c5db13a-146a-4142-bdce-23b682fc7573","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"51cc5e03-e283-4bb4-9ce0-10bff67ca886","successorId":"6c65c85c-8756-4014-a51a-b20657d1a01b","templateNodeId":"task.plaatsen->task.isolatie","templateVersion":2,"ruleId":"gen.dep.task.plaatsen->task.isolatie","createdAt":"2026-07-12T22:11:02.828Z"},{"id":"3e9bc6db-ff8b-416f-82f1-be68cafa4b9f","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"d418351d-0b41-4629-a710-b1e0d6aa1156","successorId":"757975ef-3e6b-4ce1-8952-cf2457803fff","templateNodeId":"task.productie->task.dakopen","templateVersion":2,"ruleId":"gen.dep.task.productie->task.dakopen","createdAt":"2026-07-12T22:11:02.830Z"},{"id":"92aa76f2-ae04-4f48-9bc3-cf0bb8b38b24","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"8f7e03b3-602d-44cd-8767-2844f565a4d5","successorId":"d34c8456-f741-4cb8-a9a6-186010771ed0","templateNodeId":"task.rookmelder->task.oplevering","templateVersion":2,"ruleId":"gen.dep.task.rookmelder->task.oplevering","createdAt":"2026-07-12T22:11:02.831Z"},{"id":"4ab6a31b-759b-42fb-8bf3-d97dfcdd5fe5","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"76b4a215-e24e-486c-8d88-ebd2f714d3b8","successorId":"8f7e03b3-602d-44cd-8767-2844f565a4d5","templateNodeId":"task.schilderen->task.rookmelder","templateVersion":2,"ruleId":"gen.dep.task.schilderen->task.rookmelder","createdAt":"2026-07-12T22:11:02.832Z"},{"id":"50a42d3a-51c8-40ad-aa77-51f22f7ca333","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"c92a6378-498c-4cb9-9532-fd3b9e80fdf5","successorId":"d34c8456-f741-4cb8-a9a6-186010771ed0","templateNodeId":"task.vensterbank->task.oplevering","templateVersion":2,"ruleId":"gen.dep.task.vensterbank->task.oplevering","createdAt":"2026-07-12T22:11:02.833Z"},{"id":"5ec17804-4ea8-44b5-b2c0-c35b775be79d","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"3ac420ba-0954-4758-9a31-1968eda1c36c","successorId":"aa274d27-df1d-4997-9661-f9de34db04fc","templateNodeId":"task.vergunning->task.inmeten","templateVersion":2,"ruleId":"gen.dep.task.vergunning->task.inmeten","createdAt":"2026-07-12T22:11:02.834Z"},{"id":"bda67075-9afe-4a09-9d74-38d54cc92a0d","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"02345fe7-4330-4f2a-92e9-eeeeef529456","successorId":"757975ef-3e6b-4ce1-8952-cf2457803fff","templateNodeId":"task.verzekering->task.dakopen","templateVersion":2,"ruleId":"gen.dep.task.verzekering->task.dakopen","createdAt":"2026-07-12T22:11:02.835Z"},{"id":"b5925149-665c-4201-ade3-55c65ab00791","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"d82bcf61-05ce-42b1-9ed9-6b4ddd9c3a8d","successorId":"aa274d27-df1d-4997-9661-f9de34db04fc","templateNodeId":"task.vve->task.inmeten","templateVersion":2,"ruleId":"gen.dep.task.vve->task.inmeten","createdAt":"2026-07-12T22:11:02.836Z"},{"id":"90da00fa-dfb2-4404-ac80-16c6f2961142","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"5a9da270-e7e6-483f-8324-a843882cfdf7","successorId":"76b4a215-e24e-486c-8d88-ebd2f714d3b8","templateNodeId":"task.wanden->task.schilderen","templateVersion":2,"ruleId":"gen.dep.task.wanden->task.schilderen","createdAt":"2026-07-12T22:11:02.837Z"},{"id":"e2aab509-21c9-45a5-9296-f38510c19125","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"5a9da270-e7e6-483f-8324-a843882cfdf7","successorId":"c92a6378-498c-4cb9-9532-fd3b9e80fdf5","templateNodeId":"task.wanden->task.vensterbank","templateVersion":2,"ruleId":"gen.dep.task.wanden->task.vensterbank","createdAt":"2026-07-12T22:11:02.838Z"},{"id":"ee9bcfc3-43c3-4c37-aa2b-471f1e9cef02","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","predecessorId":"e246626e-99f6-4573-a4c6-9c74a794cccf","successorId":"757975ef-3e6b-4ce1-8952-cf2457803fff","templateNodeId":"task.zolder->task.dakopen","templateVersion":2,"ruleId":"gen.dep.task.zolder->task.dakopen","createdAt":"2026-07-12T22:11:02.840Z"}],"decisions":[{"id":"19767bf0-aea9-420a-b0e7-67de8df3007c","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","naam":"Keuze uitvoering (breedte, kozijnen, zijwangen)","omschrijving":"Breedte, draai-kiepramen of schuiframen, kunststof of hout, kleur.","status":"OPEN","uitersteBeslisdatum":"2026-09-07T00:00:00.000Z","ankerBeslisdatum":null,"beslistOp":null,"keuze":null,"bufferWerkdagen":3,"templateNodeId":"dec.uitvoering","templateVersion":2,"ruleId":"gen.dec.uitvoering","createdAt":"2026-07-12T22:11:02.754Z"}],"materials":[{"id":"1d13c472-68b1-48a2-b266-516f43019266","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","naam":"Prefab dakkapel","levertijdWerkdagen":40,"bestelStatus":"NIET_BESTELD","besteldatum":"2026-09-10T00:00:00.000Z","leverdatum":null,"decisionId":"19767bf0-aea9-420a-b0e7-67de8df3007c","templateNodeId":"mat.dakkapel","templateVersion":2,"ruleId":"gen.mat.dakkapel","createdAt":"2026-07-12T22:11:02.757Z"}],"budgetItems":[{"id":"26879916-6d6b-4757-80ba-8efe56b0d764","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"ed973ad2-3a1e-4627-8141-34ee78dfcced","scopeItemId":"361279ad-fd04-4086-abb0-d4c446d6451b","taskId":null,"naam":"Dakkapel (productie en plaatsing)","status":"RAMING","bedragCents":750000,"quoteId":null,"verwachteBetaaldatum":null,"templateNodeId":"budget.dakkapel","templateVersion":2,"ruleId":"gen.budget.dakkapel","createdAt":"2026-07-12T22:11:02.852Z","updatedAt":"2026-07-12T22:11:02.852Z"},{"id":"74b409aa-9f5e-4ef4-a86c-38f01980145a","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","workPackageId":"1ad91ea0-7050-4df5-83d5-f7898cc6c54b","scopeItemId":"d2dd2d28-2fcf-4247-ba92-d81f4155f76b","taskId":null,"naam":"Binnenafwerking en elektra","status":"RAMING","bedragCents":250000,"quoteId":null,"verwachteBetaaldatum":null,"templateNodeId":"budget.afwerking","templateVersion":2,"ruleId":"gen.budget.afwerking","createdAt":"2026-07-12T22:11:02.855Z","updatedAt":"2026-07-12T22:11:02.855Z"}],"quotes":[],"photos":[],"qualityGates":[{"id":"baacfcc4-8db2-4696-9925-ad593dd16bac","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","taskId":"74758fa9-a031-4045-afb5-d349bfc10cca","naam":"Constructieberekening aanwezig vóór plaatsing","type":"GEKWALIFICEERD_BEWIJS","status":"OPEN","afwijkingsReden":null,"afgehandeldDoor":null,"afgehandeldOp":null,"templateNodeId":"gate.constructie","templateVersion":2,"ruleId":"gen.gate.constructie","createdAt":"2026-07-12T22:11:02.842Z"},{"id":"9795b5c2-9b84-4f20-b2d3-c479e65033df","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","taskId":"51cc5e03-e283-4bb4-9ce0-10bff67ca886","naam":"Foto dakaansluiting vóór binnenafwerking","type":"FOTO","status":"OPEN","afwijkingsReden":null,"afgehandeldDoor":null,"afgehandeldOp":null,"templateNodeId":"gate.waterdicht","templateVersion":2,"ruleId":"gen.gate.waterdicht","createdAt":"2026-07-12T22:11:02.846Z"},{"id":"65f3e7e7-b167-4763-9116-48e341eccceb","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","taskId":"6d11c7f7-564a-4f3c-87c2-7d39a88f896a","naam":"Bewijs gekwalificeerde uitvoering elektra","type":"GEKWALIFICEERD_BEWIJS","status":"OPEN","afwijkingsReden":null,"afgehandeldDoor":null,"afgehandeldOp":null,"templateNodeId":"gate.elektra","templateVersion":2,"ruleId":"gen.gate.elektra","createdAt":"2026-07-12T22:11:02.848Z"},{"id":"935f6d3c-6ea6-4d38-b5ae-ece590ef2075","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","taskId":"6c65c85c-8756-4014-a51a-b20657d1a01b","naam":"Foto dampdichte aansluiting vóór wandafwerking","type":"FOTO","status":"OPEN","afwijkingsReden":null,"afgehandeldDoor":null,"afgehandeldOp":null,"templateNodeId":"gate.isolatie","templateVersion":2,"ruleId":"gen.gate.isolatie","createdAt":"2026-07-12T22:11:02.849Z"}],"changeRequests":[],"auditEvents":[{"id":"d4ad1740-8d3d-431e-9c41-1ec058409793","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"scope_item_gegenereerd","entiteitType":"TemplateNode","entiteitId":"scope.dakkapel","ruleId":"gen.scope.dakkapel","templateVersion":2,"inputSnapshot":{"node":{"data":{"status":"IN_SCOPE"},"type":"SCOPE_ITEM","nodeKey":"scope.dakkapel"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.858Z"},{"id":"3ddd7b6e-99a2-46e6-aba4-fa1e5bc9c06b","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"scope_item_gegenereerd","entiteitType":"TemplateNode","entiteitId":"scope.binnen","ruleId":"gen.scope.binnen","templateVersion":2,"inputSnapshot":{"node":{"data":{"status":"IN_SCOPE"},"type":"SCOPE_ITEM","nodeKey":"scope.binnen"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.861Z"},{"id":"2bced104-96a7-41ae-b75d-c54150affb4d","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"werkpakket_gegenereerd","entiteitType":"TemplateNode","entiteitId":"wp.papierwerk","ruleId":"gen.wp.papierwerk","templateVersion":2,"inputSnapshot":{"node":{"data":{"vakgebied":"algemeen","omschrijving":"Vergunningcheck, constructeur, offertes — hier zit de meeste doorlooptijd."},"type":"WORKPACKAGE","nodeKey":"wp.papierwerk"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.863Z"},{"id":"33183dd9-3ff6-4ace-ba36-b127a81a2204","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.vergunning","ruleId":"gen.task.vergunning","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Aan de voorkant of zijkant is een dakkapel vrijwel altijd vergunningplichtig; aan de achterkant vaak vergunningsvrij binnen de regels (check omgevingsloket.nl). Reken bij een vergunning op 8 weken + 6 weken bezwaartermijn — de duur van deze taak ís die wachttijd.","uitleg":"Zonder vergunning plaatsen betekent risico op afbraak. Dit is de langste wachttijd van het hele project.","vakgebied":"algemeen","kostenCents":25000,"classificatie":"CONTROLE_AANBEVOLEN","duurWerkdagen":40,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.vergunning"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.864Z"},{"id":"0f5b48df-6ef7-4962-8eb4-51d21e8fb428","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.constructeur","ruleId":"gen.task.constructeur","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"De sporen van het dak worden doorgezaagd: een constructeur moet de raveelconstructie berekenen. Bij een vergunning is de berekening verplicht onderdeel van de aanvraag.","uitleg":"Zonder berekening kan het dak op termijn doorzakken — en keurt de gemeente de aanvraag af.","vakgebied":"constructie","kostenCents":60000,"classificatie":"VERPLICHT_GEKWALIFICEERD","duurWerkdagen":5,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.constructeur"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.865Z"},{"id":"fa24a4f2-fe70-4c49-9314-c927edd85463","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.vve","ruleId":"gen.task.vve","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Bij een appartement of huurwoning: het dak is niet van jou alleen. Regel schriftelijke toestemming vóór je bestelt. Eigen woning zonder VvE? Zet deze taak op 'niet van toepassing'.","vakgebied":"algemeen","kostenCents":0,"classificatie":"VRIJ","duurWerkdagen":1,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.vve"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.867Z"},{"id":"93bf65f6-62c4-4a03-a6f2-d43399d864a1","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.ecologie","ruleId":"gen.task.ecologie","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Vleermuizen, gierzwaluwen en huismussen onder dakpannen zijn wettelijk beschermd — ook bij een vergunningsvrije dakkapel geldt de zorgplicht. Kijk naar poepsporen onder de dakrand en open stootvoegen; bij twijfel is een ecologische quickscan nodig en kan het broedseizoen (maart–augustus) de planning bepalen.","uitleg":"Beschermde soorten aantreffen op de plaatsingsdag betekent per direct een bouwstop — dit wil je maanden eerder weten.","vakgebied":"algemeen","kostenCents":0,"classificatie":"CONTROLE_AANBEVOLEN","duurWerkdagen":1,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.ecologie"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.868Z"},{"id":"2f5c27f6-c287-47d1-b0f1-593ff70e8e30","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.offertes","ruleId":"gen.task.offertes","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Vraag wat er precies bij zit: kraan, afvoer dakpannen, binnenafwerking en stucwerk verschillen sterk per aanbieder. Vraag referentieadressen in de buurt en check de garantie op waterdichtheid (10 jaar is gangbaar).","vakgebied":"algemeen","kostenCents":0,"classificatie":"VRIJ","duurWerkdagen":10},"type":"TASK","nodeKey":"task.offertes"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.870Z"},{"id":"44f8468b-b450-4454-907e-e30ce201c3a6","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.verzekering","ruleId":"gen.task.verzekering","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Een open dak is een risico: meld de plaatsing bij je verzekeraar en vraag de plaatser om zijn CAR-polis.","uitleg":"Stormschade tijdens een open-dak-nacht is anders niet gedekt.","vakgebied":"algemeen","kostenCents":0,"classificatie":"VRIJ","duurWerkdagen":1,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.verzekering"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.871Z"},{"id":"91bff2a9-58d5-40aa-9a67-354a0d09145d","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.dossier","ruleId":"gen.task.dossier","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Bewaar de constructieberekening, vergunning, offertes, garantiecertificaten en foto's van de dakaansluiting in één digitale map — die berekening heb je bij verkoop van het huis weer nodig. Houd ook een besluitenlijstje bij.","uitleg":"Bij een geschil, garantieclaim of verkoop is je dossier het bewijs.","vakgebied":"algemeen","kostenCents":0,"classificatie":"VRIJ","duurWerkdagen":1,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.dossier"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.872Z"},{"id":"d03ebf0a-24d2-4743-a35e-5672bce0e463","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"werkpakket_gegenereerd","entiteitType":"TemplateNode","entiteitId":"wp.bestellen","ruleId":"gen.wp.bestellen","templateVersion":2,"inputSnapshot":{"node":{"data":{"vakgebied":"algemeen","omschrijving":"Prefab-productie (6–10 weken) en alles regelen voor de plaatsingsdag."},"type":"WORKPACKAGE","nodeKey":"wp.bestellen"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.874Z"},{"id":"3f29c2fd-cdba-4525-9312-73f1cfd675d4","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.inmeten","ruleId":"gen.task.inmeten","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"De fabrikant meet het dak, de sporenafstand en de hellingshoek na. Pas daarna start de productie — wijzigingen zijn daarna niet meer mogelijk.","vakgebied":"bouw","kostenCents":0,"decisionKeys":["dec.uitvoering"],"classificatie":"SPECIALIST","duurWerkdagen":1},"type":"TASK","nodeKey":"task.inmeten"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.876Z"},{"id":"6412d8b4-0550-422b-8db2-41610e1ea8c7","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.productie","ruleId":"gen.task.productie","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Prefab-productie duurt 6–10 weken. Gebruik deze wachttijd om de zolder leeg te ruimen en de binnenafwerking te plannen.","uitleg":"Deze wachttijd hoort zichtbaar in de planning — de plaatsingsdatum wordt pas bevestigd als de productie klaar is.","vakgebied":"algemeen","kostenCents":0,"classificatie":"VRIJ","duurWerkdagen":35,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.productie"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.877Z"},{"id":"a85ad20e-ab42-4914-96b9-e4319e29c3b2","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.kraan","ruleId":"gen.task.kraan","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"De kraan moet vrij kunnen opstellen: geen bomen of kabels boven het werkgebied, vaak een tijdelijke wegafzetting (gemeente: 1–2 weken doorlooptijd). Vraag of de plaatser dit regelt of jij.","uitleg":"Een kraan die niet kan staan op de plaatsingsdag kost een volledige dagprijs aan annulering.","vakgebied":"algemeen","kostenCents":45000,"classificatie":"VRIJ","duurWerkdagen":1,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.kraan"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.879Z"},{"id":"0e5f3de6-61eb-4868-9849-09e14c1e4a05","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.buren","ruleId":"gen.task.buren","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"De kraan draait soms over tuinen of auto's van de buren — vraag of ze hun auto verzetten. Bij een rijtjeshuis: check of de steiger deels bij de buren moet staan.","vakgebied":"algemeen","kostenCents":0,"classificatie":"VRIJ","duurWerkdagen":1,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.buren"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.880Z"},{"id":"258842e5-9762-43f2-a69c-7824bfd7b7ea","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.zolder","ruleId":"gen.task.zolder","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Alles binnen 2 meter van het werkgebied weg; dek de rest af tegen stof en eventuele regen tijdens het open dak. Denk ook aan de trap en overloop als looproute.","vakgebied":"algemeen","kostenCents":0,"classificatie":"VRIJ","duurWerkdagen":1},"type":"TASK","nodeKey":"task.zolder"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.881Z"},{"id":"9a3f38ac-625a-4ee4-84c2-5391a4438100","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"werkpakket_gegenereerd","entiteitType":"TemplateNode","entiteitId":"wp.plaatsing","ruleId":"gen.wp.plaatsing","templateVersion":2,"inputSnapshot":{"node":{"data":{"vakgebied":"bouw","omschrijving":"Dak open, kraan, dakkapel erin en waterdicht — in één dag."},"type":"WORKPACKAGE","nodeKey":"wp.plaatsing"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.882Z"},{"id":"05a3821c-39d2-4184-b378-55ef416f9038","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.dakopen","ruleId":"gen.task.dakopen","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Pannen en panlatten eruit, sporen doorzagen en ravelen volgens de constructieberekening. Check de weersverwachting: bij storm of zware regen wordt de plaatsing verzet — beter een week later dan een nat huis.","vakgebied":"bouw","kostenCents":120000,"classificatie":"SPECIALIST","duurWerkdagen":1},"type":"TASK","nodeKey":"task.dakopen"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.884Z"},{"id":"2ca05c82-6f31-459c-a6b6-e45c5d89cdb8","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.plaatsen","ruleId":"gen.task.plaatsen","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Loop dezelfde dag de waterdichting na: loodslabben, kilgoten en de aansluiting op de pannen. Maak foto's van de aansluitingen vóór de afwerking erover gaat.","uitleg":"Dichtbouwalarm: de dakaansluiting is na de binnenafwerking niet meer te inspecteren.","vakgebied":"bouw","kostenCents":550000,"decisionKeys":["dec.uitvoering"],"materialKeys":["mat.dakkapel"],"classificatie":"SPECIALIST","duurWerkdagen":1},"type":"TASK","nodeKey":"task.plaatsen"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.885Z"},{"id":"9df56513-517c-4a65-8e7d-3bde5b7e5e52","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"werkpakket_gegenereerd","entiteitType":"TemplateNode","entiteitId":"wp.afwerking","ruleId":"gen.wp.afwerking","templateVersion":2,"inputSnapshot":{"node":{"data":{"vakgebied":"afbouw","omschrijving":"Isolatie afwerken, wanden, elektra, vensterbank en schilderwerk."},"type":"WORKPACKAGE","nodeKey":"wp.afwerking"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.887Z"},{"id":"ead75a48-0d81-496c-9a1a-47f392990264","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.elektra","ruleId":"gen.task.elektra","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Trek de leidingen vóór de wandafwerking. Denk aan een stopcontact bij het raam (oplader, kerstverlichting) en check of de groep de extra verwarming aankan.","vakgebied":"elektra","kostenCents":60000,"classificatie":"VERPLICHT_GEKWALIFICEERD","duurWerkdagen":1},"type":"TASK","nodeKey":"task.elektra"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.888Z"},{"id":"e2976a95-0e25-4aeb-b044-f59b877ba344","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.isolatie","ruleId":"gen.task.isolatie","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"De naden tussen dakkapel en bestaand dak moeten luchtdicht én dampdicht (tape/folie), anders krijg je condens en schimmel in de constructie.","uitleg":"Een koudebrug bij de aansluiting zie je pas jaren later — als houtrot.","vakgebied":"afbouw","kostenCents":40000,"classificatie":"SPECIALIST","duurWerkdagen":1,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.isolatie"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.889Z"},{"id":"89bae788-2b0f-4317-95de-9f88b20c2c00","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.wanden","ruleId":"gen.task.wanden","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Gipsplaten, uitvlakken en stucwerk. Stucwerk 1–2 weken laten drogen vóór het sausen — te vroeg schilderen geeft blazen.","vakgebied":"afbouw","kostenCents":90000,"classificatie":"SPECIALIST","duurWerkdagen":3},"type":"TASK","nodeKey":"task.wanden"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.891Z"},{"id":"6a55305b-6228-4cac-8a72-6e551c9c1f9f","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.vensterbank","ruleId":"gen.task.vensterbank","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Kies een vochtbestendige vensterbank — op een dakkapelkozijn condenseert het 's winters het eerst.","vakgebied":"afbouw","kostenCents":25000,"classificatie":"VRIJ","duurWerkdagen":1},"type":"TASK","nodeKey":"task.vensterbank"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.892Z"},{"id":"e177d2c1-12d0-4964-890b-0b9b86179a71","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.schilderen","ruleId":"gen.task.schilderen","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Bij woningen ouder dan 2 jaar valt schilder- en stukadoorsarbeid onder 9% btw — vraag een gesplitste factuur.","vakgebied":"afbouw","kostenCents":35000,"classificatie":"VRIJ","duurWerkdagen":2},"type":"TASK","nodeKey":"task.schilderen"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.894Z"},{"id":"58dc0083-3c05-4883-95b5-1448586dc085","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.rookmelder","ruleId":"gen.task.rookmelder","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Rookmelders zijn sinds 2022 verplicht op elke woonverdieping — een zolder die slaapkamer wordt, telt mee. Plaats hem aan het plafond, niet in de hoek, en kies er een met 10-jaarsbatterij. Gekoppelde melders wekken je ook als het beneden brandt.","uitleg":"Een nieuwe slaapverdieping zonder rookmelder is een overtreding én een risico.","vakgebied":"algemeen","kostenCents":5000,"classificatie":"VRIJ","duurWerkdagen":1,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.rookmelder"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.895Z"},{"id":"6e3f6f33-57b5-4990-8f1b-105d970fc8f0","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"werkpakket_gegenereerd","entiteitType":"TemplateNode","entiteitId":"wp.nazorg","ruleId":"gen.wp.nazorg","templateVersion":2,"inputSnapshot":{"node":{"data":{"vakgebied":"algemeen","omschrijving":"Opleveren, documentatie en controle na de eerste regenbui."},"type":"WORKPACKAGE","nodeKey":"wp.nazorg"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.896Z"},{"id":"2ba38d9a-10de-401d-9f4e-b7e2d1ed8856","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.oplevering","ruleId":"gen.task.oplevering","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Vraag het garantiecertificaat waterdichtheid, de constructieberekening en (bij vergunning) de gereedmelding bij de gemeente. Houd de laatste betaaltermijn vast tot restpunten af zijn.","vakgebied":"algemeen","kostenCents":0,"classificatie":"VRIJ","duurWerkdagen":1},"type":"TASK","nodeKey":"task.oplevering"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.898Z"},{"id":"e6501405-ac83-4b79-be54-4985c08083de","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"taak_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.regenbui","ruleId":"gen.task.regenbui","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Inspecteer na de eerste echte regenbui de hoeken, het plafond en de aansluitingen op vochtplekken. Nu melden = garantie; over een jaar is het discussie.","uitleg":"Vrijwel elk dakkapellek openbaart zich in de eerste weken — maar niemand kijkt.","vakgebied":"algemeen","kostenCents":0,"classificatie":"VRIJ","duurWerkdagen":1,"isOftenForgotten":true},"type":"TASK","nodeKey":"task.regenbui"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.899Z"},{"id":"be63cc2b-39d1-41e4-8845-b226d7067199","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"beslissing_gegenereerd","entiteitType":"TemplateNode","entiteitId":"dec.uitvoering","ruleId":"gen.dec.uitvoering","templateVersion":2,"inputSnapshot":{"node":{"data":{"tip":"Check het bestemmingsplan: veel gemeenten eisen dat de dakkapel minimaal 0,5–1 m van de dakrand blijft. Kies onderhoudsarm (kunststof/aluminium) — je komt er niet makkelijk meer bij.","omschrijving":"Breedte, draai-kiepramen of schuiframen, kunststof of hout, kleur.","bufferWerkdagen":3},"type":"DECISION","nodeKey":"dec.uitvoering"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.901Z"},{"id":"04376fc4-937e-41ad-85b6-8849d9f445e7","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"materiaal_gegenereerd","entiteitType":"TemplateNode","entiteitId":"mat.dakkapel","ruleId":"gen.mat.dakkapel","templateVersion":2,"inputSnapshot":{"node":{"data":{"decisionKey":"dec.uitvoering","levertijdWerkdagen":40},"type":"MATERIAL","nodeKey":"mat.dakkapel"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.902Z"},{"id":"87ccb2d9-482c-41eb-8475-29d6a4246c3e","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"kwaliteitsgate_gegenereerd","entiteitType":"TemplateNode","entiteitId":"gate.constructie","ruleId":"gen.gate.constructie","templateVersion":2,"inputSnapshot":{"node":{"data":{"taskKey":"task.constructeur","gateType":"GEKWALIFICEERD_BEWIJS"},"type":"QUALITY_GATE","nodeKey":"gate.constructie"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.903Z"},{"id":"c5fdfb5b-0866-4c38-b466-cc53b398e08f","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"kwaliteitsgate_gegenereerd","entiteitType":"TemplateNode","entiteitId":"gate.waterdicht","ruleId":"gen.gate.waterdicht","templateVersion":2,"inputSnapshot":{"node":{"data":{"taskKey":"task.plaatsen","gateType":"FOTO"},"type":"QUALITY_GATE","nodeKey":"gate.waterdicht"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.904Z"},{"id":"2d22e62f-0334-46f4-ad7b-f2f07e8d864a","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"kwaliteitsgate_gegenereerd","entiteitType":"TemplateNode","entiteitId":"gate.elektra","ruleId":"gen.gate.elektra","templateVersion":2,"inputSnapshot":{"node":{"data":{"taskKey":"task.elektra","gateType":"GEKWALIFICEERD_BEWIJS"},"type":"QUALITY_GATE","nodeKey":"gate.elektra"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.905Z"},{"id":"2db02787-dcac-4fd2-9c13-85525cd113ee","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"kwaliteitsgate_gegenereerd","entiteitType":"TemplateNode","entiteitId":"gate.isolatie","ruleId":"gen.gate.isolatie","templateVersion":2,"inputSnapshot":{"node":{"data":{"taskKey":"task.isolatie","gateType":"FOTO"},"type":"QUALITY_GATE","nodeKey":"gate.isolatie"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.907Z"},{"id":"7d6ab778-d0d8-44d3-b5d3-fc1267974d43","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"budgetpost_gegenereerd","entiteitType":"TemplateNode","entiteitId":"budget.dakkapel","ruleId":"gen.budget.dakkapel","templateVersion":2,"inputSnapshot":{"node":{"data":{"bedragCents":750000,"scopeItemKey":"scope.dakkapel"},"type":"BUDGET_ITEM","nodeKey":"budget.dakkapel"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.908Z"},{"id":"87dcbff4-02be-4c02-aa51-97b5cfb29680","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"budgetpost_gegenereerd","entiteitType":"TemplateNode","entiteitId":"budget.afwerking","ruleId":"gen.budget.afwerking","templateVersion":2,"inputSnapshot":{"node":{"data":{"bedragCents":250000,"scopeItemKey":"scope.binnen"},"type":"BUDGET_ITEM","nodeKey":"budget.afwerking"},"params":{"opties":{"vloerverwarming":false},"projectType":"DAKKAPEL","gewensteStart":"2026-07-14","budgetMaxCents":null,"budgetMinCents":null,"zelfwerkzaamheid":"DEELS_ZELF"}},"data":null,"createdAt":"2026-07-12T22:11:02.909Z"},{"id":"97e8c3a5-dabb-488b-aa25-1a257f5f9d94","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.buren->task.dakopen","ruleId":"gen.dep.task.buren->task.dakopen","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.dakopen","predecessorKey":"task.buren"}},"data":null,"createdAt":"2026-07-12T22:11:02.910Z"},{"id":"dde43771-75de-4863-911e-60040fce75d6","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.constructeur->task.vergunning","ruleId":"gen.dep.task.constructeur->task.vergunning","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.vergunning","predecessorKey":"task.constructeur"}},"data":null,"createdAt":"2026-07-12T22:11:02.911Z"},{"id":"fcb8717d-716a-45aa-bfad-35088cb69ad2","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.dakopen->task.plaatsen","ruleId":"gen.dep.task.dakopen->task.plaatsen","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.plaatsen","predecessorKey":"task.dakopen"}},"data":null,"createdAt":"2026-07-12T22:11:02.912Z"},{"id":"de5c1689-f26f-4985-9667-b1f6ca8e099d","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.dossier->task.inmeten","ruleId":"gen.dep.task.dossier->task.inmeten","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.inmeten","predecessorKey":"task.dossier"}},"data":null,"createdAt":"2026-07-12T22:11:02.913Z"},{"id":"5f50c30a-9477-4cbe-bbbe-c48bf4510bfc","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.ecologie->task.inmeten","ruleId":"gen.dep.task.ecologie->task.inmeten","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.inmeten","predecessorKey":"task.ecologie"}},"data":null,"createdAt":"2026-07-12T22:11:02.914Z"},{"id":"c8d275ca-b7d4-4c93-bac1-be30f367c06e","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.elektra->task.wanden","ruleId":"gen.dep.task.elektra->task.wanden","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.wanden","predecessorKey":"task.elektra"}},"data":null,"createdAt":"2026-07-12T22:11:02.916Z"},{"id":"723971cd-3422-4737-bb54-710738e55fff","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.inmeten->task.productie","ruleId":"gen.dep.task.inmeten->task.productie","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.productie","predecessorKey":"task.inmeten"}},"data":null,"createdAt":"2026-07-12T22:11:02.917Z"},{"id":"bd866bc6-ae9b-4caf-87ce-98919f9197ca","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.isolatie->task.wanden","ruleId":"gen.dep.task.isolatie->task.wanden","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.wanden","predecessorKey":"task.isolatie"}},"data":null,"createdAt":"2026-07-12T22:11:02.918Z"},{"id":"5fa1363e-e6a1-4481-bfcf-eae59875a16c","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.kraan->task.dakopen","ruleId":"gen.dep.task.kraan->task.dakopen","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.dakopen","predecessorKey":"task.kraan"}},"data":null,"createdAt":"2026-07-12T22:11:02.919Z"},{"id":"37d08a74-8e18-4598-9de9-6b7001ecfc41","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.offertes->task.inmeten","ruleId":"gen.dep.task.offertes->task.inmeten","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.inmeten","predecessorKey":"task.offertes"}},"data":null,"createdAt":"2026-07-12T22:11:02.920Z"},{"id":"8b5a3d6e-a7b3-40b0-be9d-7f40af726fce","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.oplevering->task.regenbui","ruleId":"gen.dep.task.oplevering->task.regenbui","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.regenbui","predecessorKey":"task.oplevering"}},"data":null,"createdAt":"2026-07-12T22:11:02.921Z"},{"id":"3e2eb13f-51db-4032-87bc-0c15fd2b3312","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.plaatsen->task.elektra","ruleId":"gen.dep.task.plaatsen->task.elektra","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.elektra","predecessorKey":"task.plaatsen"}},"data":null,"createdAt":"2026-07-12T22:11:02.923Z"},{"id":"55ea7628-87df-44ae-89da-57afc04ed7ad","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.plaatsen->task.isolatie","ruleId":"gen.dep.task.plaatsen->task.isolatie","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.isolatie","predecessorKey":"task.plaatsen"}},"data":null,"createdAt":"2026-07-12T22:11:02.924Z"},{"id":"e579bb4a-7be3-43e6-ab5b-cb5dd693c315","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.productie->task.dakopen","ruleId":"gen.dep.task.productie->task.dakopen","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.dakopen","predecessorKey":"task.productie"}},"data":null,"createdAt":"2026-07-12T22:11:02.925Z"},{"id":"9f38976a-ea57-4331-8ffb-30d6b32132e5","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.rookmelder->task.oplevering","ruleId":"gen.dep.task.rookmelder->task.oplevering","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.oplevering","predecessorKey":"task.rookmelder"}},"data":null,"createdAt":"2026-07-12T22:11:02.926Z"},{"id":"7eaad80c-38c6-427f-b811-50bc3e93ee6d","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.schilderen->task.rookmelder","ruleId":"gen.dep.task.schilderen->task.rookmelder","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.rookmelder","predecessorKey":"task.schilderen"}},"data":null,"createdAt":"2026-07-12T22:11:02.927Z"},{"id":"eeacde55-c19d-4307-8b88-013232e12b1e","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.vensterbank->task.oplevering","ruleId":"gen.dep.task.vensterbank->task.oplevering","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.oplevering","predecessorKey":"task.vensterbank"}},"data":null,"createdAt":"2026-07-12T22:11:02.929Z"},{"id":"b4489dc7-baae-4bac-8d63-0cc9d97e94fd","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.vergunning->task.inmeten","ruleId":"gen.dep.task.vergunning->task.inmeten","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.inmeten","predecessorKey":"task.vergunning"}},"data":null,"createdAt":"2026-07-12T22:11:02.930Z"},{"id":"40dffd8b-204c-4366-9515-0a86003893ef","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.verzekering->task.dakopen","ruleId":"gen.dep.task.verzekering->task.dakopen","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.dakopen","predecessorKey":"task.verzekering"}},"data":null,"createdAt":"2026-07-12T22:11:02.931Z"},{"id":"39836681-d158-4624-a526-6cf96b5c6102","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.vve->task.inmeten","ruleId":"gen.dep.task.vve->task.inmeten","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.inmeten","predecessorKey":"task.vve"}},"data":null,"createdAt":"2026-07-12T22:11:02.932Z"},{"id":"691ac49e-bbc6-4056-b8e0-9d3b4baf635c","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.wanden->task.schilderen","ruleId":"gen.dep.task.wanden->task.schilderen","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.schilderen","predecessorKey":"task.wanden"}},"data":null,"createdAt":"2026-07-12T22:11:02.933Z"},{"id":"4ec136d4-bc06-4f32-93b3-444c589e9fff","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.wanden->task.vensterbank","ruleId":"gen.dep.task.wanden->task.vensterbank","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.vensterbank","predecessorKey":"task.wanden"}},"data":null,"createdAt":"2026-07-12T22:11:02.934Z"},{"id":"629da9e9-7390-4343-a285-5e09ddb4a777","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"GENERATOR","actorId":null,"actie":"afhankelijkheid_gegenereerd","entiteitType":"TemplateNode","entiteitId":"task.zolder->task.dakopen","ruleId":"gen.dep.task.zolder->task.dakopen","templateVersion":2,"inputSnapshot":{"dep":{"successorKey":"task.dakopen","predecessorKey":"task.zolder"}},"data":null,"createdAt":"2026-07-12T22:11:02.936Z"},{"id":"c842ca63-dc62-41f3-a678-550832642a1d","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"SYSTEEM","actorId":null,"actie":"planning_herberekend","entiteitType":"Project","entiteitId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","ruleId":"engine.schedule","templateVersion":null,"inputSnapshot":{"aanleiding":"initiele_generatie"},"data":{"onplanbaar":[]},"createdAt":"2026-07-12T22:11:03.013Z"},{"id":"44d954f3-eb1f-4a76-af54-08b319caa84f","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"project_aangemaakt","entiteitType":"Project","entiteitId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","ruleId":null,"templateVersion":2,"inputSnapshot":null,"data":null,"createdAt":"2026-07-12T22:11:03.019Z"},{"id":"7b5db2b7-3e4e-4c19-b08a-5092fb3a1e1e","projectId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","actorType":"USER","actorId":"140287ce-5672-4db0-bf62-212010dee8bb","actie":"project_geexporteerd","entiteitType":"Project","entiteitId":"2e93f2b0-6132-4c93-a3ed-f56147e36ad9","ruleId":null,"templateVersion":null,"inputSnapshot":null,"data":null,"createdAt":"2026-07-13T03:27:43.470Z"}],"manualCorrections":[],"emailLogs":[]}